Photo: Road paving underway in Iqaluit

Road repaving is underway along a section of Niaqunngusiaq (Apex) Road in Iqaluit, stretching east from the intersection with the city’s near Qikiqtani General Hospital to a water booster station, for about 300 metres. A partial road closure brings traffic down to one lane, alternating in each direction, the city’s department of engineering said. “There are a lot of potholes on that section of pavement, and we’re also paving the whole laneway of the water booster station,” said Meagan Leach, director of the department. The work will finish Sept. 15 at the earliest, she said, weather permitting. (PHOTO BY PETER VARGA)
(0) Comments